hi-tech
Hi-Tech News
Hi-Tech Property Services Ltd working with the government to eradicate bullying

Hi-Tech Property Services Ltd working with the government to eradicate bullying

Hi-Tech Property Services have recently completed a state of the art refurbishment of a Toilet Block... Hi-Tech Property Services Ltd working with the government to eradicate bullying - Read More

 
New Horizons

New Horizons

With 30 years experience in the building industry Gary Waterman founded Hi-Tech  to deliver building... New Horizons - Read More

 
Industry News
E-News




Staff Login

Drainage repairs to car park


The problem
Southern processing Ltd contacted Hi-Tech Property Services Ltd and requested a site visit regarding a continual problem with poor yard drainage and concrete damage that required repairs at their site in Southampton Hampshire

The solution
Hi-Tech Property Services Ltd attended the site and made recommendations to cut out and remove all the damaged concrete areas, remove and replace defective drainage with new yard gullies connected to an oil interception drain. Fibre reinforced concrete was used to repair the damaged areas of the yard. All areas were protected with steel road plates for two weeks after completion of the work to minimise damage to the new concrete from heavy vehicles.

The result
The site now has a fully operational drainage system that will help to protect the new concrete from becoming damaged in the future.


Featured Case Studies

Drainage repairs to car park


{image1}The problem
Southern processing Ltd contacted Hi-Tech Property Services Ltd and requested a site visit regarding a continual problem with poor yard drainage and concrete damage that required repairs at their site in Southampton Hampshire

The solution
Hi-Tech Property Services Ltd attended the site and made recommendations to cut out and remove all the damaged concrete areas, remove and replace defective drainage with new yard gullies connected to an oil interception drain. Fibre reinforced concrete was used to repair the damaged areas of the yard. All areas were protected...

Drainage


Client   JT Builders


{image1}Project   Durley Avenue


Upon inspection all the existing drains had callapsed and had the incorrect falls. Hi-Tech Property Services carried out a CCTV survey and produced a written report with Cad drawings and DVD explaining the problem in detail.
To remedy the problem a new drainage system was installed after excavation and removal of the existing.
The system is now fully operational and the works were completed in 2 weeks from commencement to completion.