hi-tech
Hi-Tech News
Hi-Tech Property Services Ltd working with the government to eradicate bullying

Hi-Tech Property Services Ltd working with the government to eradicate bullying

Hi-Tech Property Services have recently completed a state of the art refurbishment of a Toilet Block... Hi-Tech Property Services Ltd working with the government to eradicate bullying - Read More

 
New Horizons

New Horizons

With 30 years experience in the building industry Gary Waterman founded Hi-Tech  to deliver building... New Horizons - Read More

 
Industry News
E-News




Staff Login

Case Studies

General

Client  Mr & Mrs Goldman

 
Project  The construction of 3 purpose built homes
We carried out the demolition of the existing bungalow and carried out the construction of 3 new build 3 bedroom houses on the existing plot.
The homes were to a very high specification using sustainable and recycled materials in line with our Environmental policy.
The works were completed in a time frame of 16 weeks and came complete with our 10 year NHBC guarantee.

Read More - General


Extension

Complete refurbishment and large extension.

  • Three bedrooms.
  • Two en-suite shower rooms.
  • A large family bathroom.
  • Kitchen.
  • Lounge and dining room.
  • Complete with a new tiled roof.

Read More - Extension


Conservation & Repair

 

Public House Wiltshire

Hi-Tech Property Services have established an enviable reputation in working on a number of prominent historic buildings across the South.

Here in this example, we have a Grade II listed Public House, undergoing extensive remedial works to the roof coverings and structural timbers below.

Carefully removing and salvaging as many of the original peg tiles as possible we sensitively incorporated new tiles in discrete areas to minimise any visual impact, as well as undertaking consequential improvements to insulation levels in...

Read More - Conservation & Repair


Drainage

Client   JT Builders


Project   Durley Avenue


Upon inspection all the existing drains had callapsed and had the incorrect falls. Hi-Tech Property Services carried out a CCTV survey and produced a written report with Cad drawings and DVD explaining the problem in detail.
To remedy the problem a new drainage system was installed after excavation and removal of the existing.
The system is now fully operational and the works were completed in 2 weeks from commencement to completion.

Read More - Drainage


Drainage repairs to car park

The problem
Southern processing Ltd contacted Hi-Tech Property Services Ltd and requested a site visit regarding a continual problem with poor yard drainage and concrete damage that required repairs at their site in Southampton Hampshire

The solution
Hi-Tech Property Services Ltd attended the site and made recommendations to cut out and remove all the damaged concrete areas, remove and replace defective drainage with new yard gullies connected to an oil interception drain. Fibre reinforced concrete was used to repair the damaged areas of the yard. All areas were protected...

Read More - Drainage repairs to car park


NHS offices

Client Local NHS offices


Our client had poor access for disabled employees and visitors, this arrangement with different levels, ramps and hoists was installed to the latest building regulations and has given all users a cost effective solution to a very common problem.

Read More - NHS offices


Private Dwelling

We recently carried out renovation to this 150 year old building, which was experiencing extensive water ingress.


The work included full renovation of the external window frames, facias and French windows.


The roof ridge and hips also required full restoration, as did the chimney stacks, necessitating the erection of scaffolding.


All leaks have now been rectified and the client has piece of mind that all works come complete with a 15 Year Insurance backed gaurentee.

Read More - Private Dwelling


Local Authority School

Client City Council

Project Local Authority School

 

We were successful with winning the competitive tender for the replacement of the slate roof to this particular school.
Extensive water ingress was occurring resulting in disruption to classes during term times.
A very tight time frame was given to completely strip off the existing roof, replace defective joists, battens, felt and broken tiles and replace with new.
The works were carried out within the time frame of 4 weeks and within budget to the complete...